Type Speed Test

FreeGames & Fun

A typing test that measures words per minute, raw speed, accuracy and consistency. Pick a timed run, a word count, a quote or your own text, then see which keys trip you up and practice them. Good for anyone building speed or tracking progress.

Features

  • Timed tests from 15 to 120 seconds, 10 to 100 words, quotes or custom text
  • Optional punctuation, numbers and a stop-on-error mode
  • WPM, raw WPM, accuracy and consistency, with a per-second speed chart
  • A missed-key heatmap and a drill that favors words with your weak keys
  • Personal bests per setting and a history you can export and import

Free with a RaccoonKit account. Sign in with Google, no card.

Type Speed Test result for a 30-second test: words per minute, accuracy, raw speed and consistency with a per-second speed chart, beside personal bests, the WPM progress chart and the key-error keyboardType Speed Test result for a 30-second test: words per minute, accuracy, raw speed and consistency with a per-second speed chart, beside personal bests, the WPM progress chart and the key-error keyboard

See all 104 tools →